I 495 NB over I 95

AT END OF I495 · County 009, Massachusetts · Built 1969 · 2 Lanes · 23,253 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
S020092XLDOTNBI
Year Built
1969
Length
102.4 m (336 ft)
Max Span
37.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
23,253
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,961,000
Total Project Cost
$13,442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.