I 95 SB over ST110

.9 MI N OF MERRIMAC RIVER · County 009, Massachusetts · Built 1967 · 5 Lanes · 55,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
A070182V4DOTNBI
Year Built
1967
Reconstructed
2017
Length
42.1 m (138.1 ft)
Max Span
22.9 m
Width
35.8 m (117.5 ft)
Lanes
5
Daily Traffic
55,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.