CAUSEWAY ROAD over MILL CREEK
0.03 MI FROM DEPOT ROAD · County 015, New Hampshire · Built 1940 · 2 Lanes · 639 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
42.884369, -70.847981
This bridge is in worse condition than 93.9% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 86 years old.
Nearby Bridges
ST286 COLLINS RD over RR ABANDONED
Built 1850
NH286 over CSX(ABD)
Built 1940
NH286 over BLACKWATER RIVER
Built 1991
NH107 over I-95
Built 1967
NH 1A over HAMPTON RIVER
Built 1949
I 95 SB CONN TOLL over I 95
Built 1967
NH 84 over I-95
Built 1975
ST286 MAIN ST over I 95
Built 1967
NH 88 over I-95
Built 1975
US 1 over TAYLOR RIVER
Built 1965
Bridge Details
- Structure #
- 023401670009100
- Year Built
- 1940
- Reconstructed
- 1988
- Length
- 12.8 m (42 ft)
- Max Span
- 12.2 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 639
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.