CROSS STREET over I-93

1.2 MI N OF MASS SL · County 015, New Hampshire · Built 2007 · 2 Lanes · 6,905 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
022800880005300
Year Built
2007
Length
132 m (433.1 ft)
Max Span
70.1 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
6,905
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.