I-93 NB over NH 38

2.0 MI N. OF NH/MA LINE · County 015, New Hampshire · Built 2013 · 5 Lanes · 47,229 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
022800790006300
Year Built
2013
Length
40.5 m (132.9 ft)
Max Span
38.4 m
Width
26.5 m (86.9 ft)
Lanes
5
Daily Traffic
47,229
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.