I-93 SB over NH 38

2.0 ML N. OF MASS SL. · County 015, New Hampshire · Built 2013 · 4 Lanes · 47,376 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
022800760006300
Year Built
2013
Length
40.2 m (131.9 ft)
Max Span
38.4 m
Width
23.2 m (76.1 ft)
Lanes
4
Daily Traffic
47,376
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.