NH 16 SP TPK over CROSS ROAD

1.4 MI S OF MILTON TL · County 017, New Hampshire · Built 1978 · 2 Lanes · 16,645 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022200590009600
Year Built
1978
Length
29.3 m (96.1 ft)
Max Span
27.4 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
16,645
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.