NH101 EB over LAMPREY RIVER

4.7MI E OF CANDIA TL · County 015, New Hampshire · Built 1983 · 2 Lanes · 21,383 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

43.029397, -71.166336

This bridge is in worse condition than 30.1% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 43 years old.

Nearby Bridges

Bridge Details

Structure #
021901440010300
Year Built
1983
Reconstructed
2000
Length
38 m (124.7 ft)
Max Span
36.6 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
21,383
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.