NH101 EB over MAIN STREET

4.2MI E OF CANDIA TL · County 015, New Hampshire · Built 1982 · 3 Lanes · 21,383 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021901340010100
Year Built
1982
Reconstructed
2000
Length
23.8 m (78.1 ft)
Max Span
22.3 m
Width
13.6 m (44.6 ft)
Lanes
3
Daily Traffic
21,383
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.