PRESCOTT ROAD over NH101

.2 MI WEST EPPING TL · County 015, New Hampshire · Built 1985 · 2 Lanes · 838 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021901610010500
Year Built
1985
Reconstructed
2016
Length
72.7 m (238.5 ft)
Max Span
35.7 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
838
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.