I-95 NB over CSX

0.6 MI N GREENLAND TL · County 015, New Hampshire · Built 1972 · 4 Lanes · 47,148 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.0505, -70.811536

This bridge is in worse condition than 30.1% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 54 years old.

Nearby Bridges

Bridge Details

Structure #
021701050012500
Year Built
1972
Length
23.8 m (78.1 ft)
Max Span
22.6 m
Width
35.1 m (115.2 ft)
Lanes
4
Daily Traffic
47,148
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.