NH 16 over PEABODY RIVER

3.0 MI JACKSON TL · County 007, New Hampshire · Built 1960 · 3 Lanes · 3,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020950800009400
Year Built
1960
Reconstructed
1994
Length
53.9 m (176.8 ft)
Max Span
21.3 m
Width
15.1 m (49.5 ft)
Lanes
3
Daily Traffic
3,350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.