DOLLY COPP ROAD over PEABODY RIVER

.46 MI. S. GORHAM T.L. · County 007, New Hampshire · Built 1950 · 2 Lanes · 441 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016451090018700
Year Built
1950
Reconstructed
1994
Length
38.1 m (125 ft)
Max Span
18.3 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
441
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.