NH 16 over PEABODY RIVER

2.3 MI JACKSON TL · County 007, New Hampshire · Built 1960 · 2 Lanes · 3,350 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
020950740008100
Year Built
1960
Length
7 m (23 ft)
Max Span
7 m
Lanes
2
Daily Traffic
3,350
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.