NH 16 NH 25 over BEARCAMP RIVER

2.5 MI S TAMWORTH T/L · County 003, New Hampshire · Built 2021 · 2 Lanes · 11,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
020401380029700
Year Built
2021
Length
127.7 m (419 ft)
Max Span
52.7 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
11,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000