I-93 SB over NH132

3.0 MI FROM MEREDITH TL · County 001, New Hampshire · Built 1963 · 2 Lanes · 10,878 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

43.633, -71.6527

This bridge is in worse condition than 61.6% of bridges in County 001. The average bridge in New Hampshire is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
018401470008200
Year Built
1963
Reconstructed
1990
Length
47.2 m (154.9 ft)
Max Span
18.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
10,878
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.