NH104 over PEMIGEWASSET RIVER

NEW HAMPTON TL · County 009, New Hampshire · Built 1987 · 2 Lanes · 9,297 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

43.606464, -71.662633

This bridge is in worse condition than 52.3% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 39 years old.

Nearby Bridges

Bridge Details

Structure #
003201830008700
Year Built
1987
Length
125.3 m (411.1 ft)
Max Span
47.2 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
9,297
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.