I-93 SB over NH104 NH132

1.05 MI N MERIDITH T.L. · County 001, New Hampshire · Built 1963 · 2 Lanes · 19,812 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

43.613272, -71.642517

This bridge is in worse condition than 61.6% of bridges in County 001. The average bridge in New Hampshire is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
018401370006000
Year Built
1963
Reconstructed
1986
Length
44.8 m (147 ft)
Max Span
19.5 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
19,812
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.