US 3 over MAPLE ST NHRR

2.3 MI FROM LACONIA T.L. · County 001, New Hampshire · Built 1947 · 2 Lanes · 17,943 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016701840013800
Year Built
1947
Reconstructed
2023
Length
53.3 m (174.9 ft)
Max Span
14 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
17,943
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.