US 3 over NHRR

2.02 MI S. MEREDITH T/L · County 001, New Hampshire · Built 1933 · 2 Lanes · 8,744 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
013901310015400
Year Built
1933
Reconstructed
2020
Length
9.8 m (32.2 ft)
Max Span
8.8 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
8,744
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.