I-93 SB over STONEHENGE ROAD

1.0 MI SO JCT RT 28 · County 015, New Hampshire · Built 1996 · 2 Lanes · 37,723 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
015401130014300
Year Built
1996
Reconstructed
2019
Length
21.9 m (71.9 ft)
Max Span
20.4 m
Width
22.9 m (75.1 ft)
Lanes
2
Daily Traffic
37,723
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.