I-93 NB over NH 28

1.7 MI S MANCHESTER TL · County 015, New Hampshire · Built 2014 · 4 Lanes · 36,675 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
015400990016100
Year Built
2014
Length
54.3 m (178.1 ft)
Max Span
51.8 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
36,675
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.