I-93 SB OFF RAMP over RECREATION TRAIL

1.5MI S MANCHESTER T/L · County 015, New Hampshire · Built 2009 · 1 Lanes · 8,122 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
015400940016400
Year Built
2009
Length
31.1 m (102 ft)
Max Span
30.3 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
8,122
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.