I-93 NB over INDUSTRIAL PK NHRR(ABD)

2 MI BETHLEHEM TL · County 009, New Hampshire · Built 1959 · 2 Lanes · 4,235 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
015301900005800
Year Built
1959
Reconstructed
1981
Length
64.6 m (211.9 ft)
Max Span
17.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,235
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.