I-93 NB over EUSTIS HILL ROAD
0.6 MI BETHLEHEM TL · County 009, New Hampshire · Built 1959 · 3 Lanes · 4,235 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.297633, -71.772003
This bridge is in worse condition than 17.9% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 67 years old.
Nearby Bridges
I-93 SB over EUSTIS HILL ROAD
Built 1959
I-93 NB over COTTAGE STREET
Built 1959
I-93 SB over COTTAGE STREET
Built 1959
US302 NH 10 NH 18 over AMMONOOSUC RIVER
Built 1950
I-93 NB over US302 NH 10 NH 18 NH116
Built 1959
I-93 SB over US302 NH 10 NH 18 NH116
Built 1959
BEACON STREET over AMMONOOSUC RIVER
Built 2000
INDUSTRIAL PARK RD over AMMONOOSUC RIVER
Built 1995
REDINGTON STREET over AMMONOOSUC RIVER
Built 2011
I-93 NB over INDUSTRIAL PK NHRR(ABD)
Built 1959
Bridge Details
- Structure #
- 015302080004200
- Year Built
- 1959
- Reconstructed
- 1991
- Length
- 13.7 m (44.9 ft)
- Max Span
- 11.9 m
- Width
- 15.3 m (50.2 ft)
- Lanes
- 3
- Daily Traffic
- 4,235
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.