I-93 SB over INDUSTRIAL PK NHRR(ABD)

2 MI BETHLEHEM TL · County 009, New Hampshire · Built 1959 · 3 Lanes · 4,499 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
015301890005800
Year Built
1959
Reconstructed
1982
Length
57 m (187 ft)
Max Span
15.2 m
Width
15.5 m (50.9 ft)
Lanes
3
Daily Traffic
4,499
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.