NH 9 over ASH SWAMP BROOK

3.2 MI E WESTMORELAND TL · County 005, New Hampshire · Built 2006 · 6 Lanes · 22,417 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
013601050006700
Year Built
2006
Length
32.9 m (107.9 ft)
Max Span
31.1 m
Width
32.9 m (107.9 ft)
Lanes
6
Daily Traffic
22,417
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.