NH 12 over BEAVER BROOK

.97 MI NW SWANZEY TL · County 005, New Hampshire · Built 2019 · 4 Lanes · 17,831 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
013601370005900
Year Built
2019
Length
8.5 m (27.9 ft)
Max Span
3.7 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
17,831
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.