NH 9 NH 10 over NH 12

NORTH JCT OF NH 9 10 &12 · County 005, New Hampshire · Built 1978 · 2 Lanes · 5,162 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013601150008900
Year Built
1978
Reconstructed
2015
Length
47.9 m (157.2 ft)
Max Span
46.3 m
Width
23.8 m (78.1 ft)
Lanes
2
Daily Traffic
5,162
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.