NH114 over STOCKER POND OUTLET

.67 MI. SW SPRINGFIELD TL · County 019, New Hampshire · Built 1934 · 2 Lanes · 715 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.491597, -72.108408

This bridge is in worse condition than 28.5% of bridges in County 019. The average bridge in New Hampshire is 0 years old; this one is 92 years old.

Nearby Bridges

Bridge Details

Structure #
010001400006900
Year Built
1934
Reconstructed
2018
Length
8.4 m (27.6 ft)
Max Span
7.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
715
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.