I-89 SB over NH114

0.6 MI FROM SPRINGFIELD T · County 019, New Hampshire · Built 1967 · 2 Lanes · 9,692 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.489808, -72.110742

This bridge is in worse condition than 28.5% of bridges in County 019. The average bridge in New Hampshire is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
010001390006700
Year Built
1967
Length
18.3 m (60 ft)
Max Span
17.1 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
9,692
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.