AREA ROAD over POOR FARM BROOK

0.16 Mi. From NH RTE 11-A · County 001, New Hampshire · Built 2011 · 2 Lanes · 160 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
009101470013800
Year Built
2011
Length
7.8 m (25.6 ft)
Max Span
7.3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
160
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.