NH 11A over POOR FARM BROOK

5.9 MI EAST LACONIA TL · County 001, New Hampshire · Built 1936 · 2 Lanes · 5,276 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
009101380013700
Year Built
1936
Reconstructed
1984
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
5,276
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.