NH 11B over GUNSTOCK RIVER

0.6 MI N JCT NH 11-A · County 001, New Hampshire · Built 1941 · 2 Lanes · 2,690 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
009101210010200
Year Built
1941
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
2,690
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.