NH 87 over LAMPREY RIVER OVERFLOW

1.25 MI SE JCT NH 125 · County 015, New Hampshire · Built 2004 · 2 Lanes · 2,689 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
007801500006900
Year Built
2004
Length
7.8 m (25.6 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
2,689
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.