NH125 over NORTH RIVER

0.1 MI. S. JCT. 155 · County 015, New Hampshire · Built 1977 · 3 Lanes · 16,805 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
007801460011100
Year Built
1977
Length
12.8 m (42 ft)
Max Span
6.1 m
Lanes
3
Daily Traffic
16,805
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.