MAIN STREET over LAMPREY RIVER
0.7 MI. RTE 125 · County 015, New Hampshire · Built 1936 · 2 Lanes · 4,039 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.039892, -71.073208
This bridge is in worse condition than 84.8% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 90 years old.
Nearby Bridges
MILL STREET over LAMPREY RIVER
Built 2004
NH125 over LAMPREY RIVER
Built 1991
NH101 WB over NH125
Built 1996
NH101 EB over NH125
Built 1997
MARTIN ROAD over NH101
Built 1995
NH101 WB over PISCASSIC RIVER
Built 1997
NH101 EB over PISCASSIC RIVER
Built 1997
MARTIN ROAD over PISCASSIC RIVER
Built 2024
NH 87 over LAMPREY RIVER
Built 2004
NH 87 over LAMPREY RIVER OVERFLOW
Built 2004
Bridge Details
- Structure #
- 007801090005500
- Year Built
- 1936
- Length
- 17.4 m (57.1 ft)
- Max Span
- 15.2 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 4,039
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.