MARTIN ROAD over PISCASSIC RIVER

0.14MI. EPPING TL · County 015, New Hampshire · Built 2024 · 2 Lanes · 449 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

43.016992, -71.085572

This bridge is in worse condition than 8.7% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
009001550013300
Year Built
2024
Length
7.8 m (25.6 ft)
Max Span
7.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
449
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.