GULF ROAD over SALMON FALLS RIVER
0.1 MI FROM MAINE SL · County 017, New Hampshire · Built 1950 · 2 Lanes · 6,132 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
43.190914, -70.826133
This bridge is in worse condition than 90.4% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 76 years old.
Nearby Bridges
DOVER-ELIOT RD over SALMON FALLS RIVER
Built 1969
GULF ROAD over FRESH CREEK
Built 1948
OAK STREET over CSX
Built 1890
WASHINGTON STREET over COCHECO RIVER
Built 2010
GERRISH ROAD over NH 16 SP TPK
Built 1956
BRATTLE ST over GREAT WORKS RIVER
Built 1961
NH 9 NH108 NB over COCHECO RIVER
Built 1977
NH 9 NH108 SB over COCHECO RIVER
Built 1976
DOW HWY over GREAT WORKS RIVER
Built 2010
STATE RD over STURGEON CREEK
Built 1940
Bridge Details
- Structure #
- 006501820012300
- Year Built
- 1950
- Reconstructed
- 1982
- Length
- 149 m (488.8 ft)
- Max Span
- 16.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 6,132
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.