NH 43 NH107 over LAMPREY RIVER

6.0 MI FROM RAYMOND TL · County 015, New Hampshire · Built 1984 · 2 Lanes · 6,595 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006001440010900
Year Built
1984
Length
8.8 m (28.9 ft)
Max Span
7.6 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
6,595
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.