NH 43 over LAMPREY RIVER

0.1 MI FROM JCT RTE 107 · County 015, New Hampshire · Built 1938 · 2 Lanes · 5,028 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006001480004800
Year Built
1938
Length
7.9 m (25.9 ft)
Max Span
7 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
5,028
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.