COTTON ROAD over LAMPREY RIVER

0.05 MI. RTE 107 · County 015, New Hampshire · Built 1986 · 2 Lanes · 762 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
006001610002300
Year Built
1986
Length
25.9 m (85 ft)
Max Span
24.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
762
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.