SANDOWN ROAD over EXETER RIVER

.1 MI EAST SANDOWN TL · County 015, New Hampshire · Built 2010 · 2 Lanes · 208 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
005900470012600
Year Built
2010
Length
6.7 m (22 ft)
Max Span
3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
208
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.