FREMONT ROAD over EXETER RIVER

1.3MI. FREMONT TL · County 015, New Hampshire · Built 1988 · 2 Lanes · 713 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
004401720010800
Year Built
1988
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
713
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000