NH107 over EXETER RIVER
FREMONT-BRENTWOOD TL · County 015, New Hampshire · Built 1988 · 2 Lanes · 4,344 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.9662, -71.086908
This bridge is in worse condition than 30.1% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 38 years old.
Nearby Bridges
MILL ROAD over EXETER RIVER
Built 1967
NH125 over EXETER RIVER
Built 1960
CRAWLEY FALLS ROAD over EXETER RIVER
Built 2014
NH111A over EXETER RIVER
Built 1978
SCRIBNER ROAD over EXETER RIVER
Built 1941
HAIGH ROAD over EXETER RIVER
Built 1979
SANDOWN ROAD over EXETER RIVER
Built 2010
SANDOWN ROAD over EXETER RIVER
Built 1998
MARTIN ROAD over PISCASSIC RIVER
Built 2024
NEW BOSTON ROAD over POWWOW RIVER
Built 2009
Bridge Details
- Structure #
- 002900570004900
- Year Built
- 1988
- Length
- 13.4 m (44 ft)
- Max Span
- 12.8 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 4,344
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.