I-89 NB over NH 13

1.4 MI NW OF BOW T.L. · County 013, New Hampshire · Built 1959 · 2 Lanes · 20,036 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
005201820005500
Year Built
1959
Reconstructed
1993
Length
44.8 m (147 ft)
Max Span
16.5 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
20,036
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.