NH 3A over NEWFOUND RIVER

2.0 MI. FROM HILL T.L. · County 009, New Hampshire · Built 1949 · 2 Lanes · 2,878 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
003201090006100
Year Built
1949
Length
21.9 m (71.9 ft)
Max Span
10.4 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
2,878
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.