NH 3A over NEWFOUND RIVER

0.7 MI N OF JCT RTE 104 · County 009, New Hampshire · Built 1999 · 2 Lanes · 5,690 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
003200970007500
Year Built
1999
Length
19.4 m (63.6 ft)
Max Span
17.7 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
5,690
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.