NH104 PLEASANT ST over NEWFOUND RIVER

0.9 MI E ALEXANDRIA TL · County 009, New Hampshire · Built 1996 · 3 Lanes · 6,148 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
003201030006300
Year Built
1996
Length
21.3 m (69.9 ft)
Max Span
19.8 m
Width
17.5 m (57.4 ft)
Lanes
3
Daily Traffic
6,148
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.