NH110 over JERICHO BROOK

3.3 MI JCT NH 110 & NH 16 · County 007, New Hampshire · Built 1954 · 2 Lanes · 1,897 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
002301890010100
Year Built
1954
Length
7.6 m (24.9 ft)
Max Span
6.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,897
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.